Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/a/6/5/bwcltd.com/httpd.www/wp-content/plugins/revslider/includes/operations.class.php on line 2758 Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/a/6/5/bwcltd.com/httpd.www/wp-content/plugins/revslider/includes/operations.class.php on line 2762 Warning: "continue" targeting switch is equivalent to "break". Did you mean to use "continue 2"? in /customers/a/6/5/bwcltd.com/httpd.www/wp-content/plugins/revslider/includes/output.class.php on line 3706 Warning: Cannot modify header information - headers already sent by (output started at /customers/a/6/5/bwcltd.com/httpd.www/wp-content/plugins/revslider/includes/operations.class.php:2758) in /customers/a/6/5/bwcltd.com/httpd.www/wp-content/plugins/onecom-vcache/vcaching.php on line 700 Warning: Cannot modify header information - headers already sent by (output started at /customers/a/6/5/bwcltd.com/httpd.www/wp-content/plugins/revslider/includes/operations.class.php:2758) in /customers/a/6/5/bwcltd.com/httpd.www/wp-content/plugins/onecom-vcache/vcaching.php on line 708 Simon West – BW Consultants Ltd

All posts by: Simon West

About Simon West

“We are absolutely delighted to have completed the extensive renovations of an historic, Grade II listed residential house overlooking Maze Hill in Greenwich, London.  Taking over 3 years to complete and divided into 2 phases, the project involved the complete renovation of the 5 storey house, whilst maintaining and refurbishing all the original features of […]

Jan 2018: BWC complete the successful renovation of oak timber panelling repairs and replacements to Toynbee Hall http://www.toynbeehall.org.uk/the-history-of-toynbee-hall-a-timeline-from-1884-2015- ) in EC1 on behalf of Thomas Sinden Construction. These intricate and highly skilled works involved repairing existing damaged panels by hand, and the installation of replacement oak panels which were made on CNC machines from hand […]

BWC invited to submit a framework agreement tender for Fusion 21 for fire door installations.

Nov 2017: BWC Complete 10-month project to fit out a 3 storey, 4-bedroom mews house in South Kensington.  This ‘Project Recovery’ project (whereby the client had parted company with the previous contractor) was an extremely challenging contract as the M&E contractor and the architect were also parted company with prior to BWC talking over the project.  […]

Sep 2017: BWC successfully complete the construction of internal partition walls, ceilings and plastering works to two adjacent, 3 storey mews houses in Victoria, London.

June 2017: BWC commence internal renovations to 8 flats in De Vere Gardens, London, on behalf of Lengard.

April 2017: BWC commence a very intricate and technical project at Goldhawk Road Villas in Chiswick to adapt 15 No. bespoke oak staircases to make the treads and risers comply with building regulations.  Works involved some design calculations and highly skilled carpentry works with French polishing the treads and risers once modified.  This project was carried […]

March 2017: BWC commence ground works at a 5-storey high end residential house in Greenwich, London. Works include underpinning of 3 underground vaults at the front of the house to create a walk- in shower room, toilet, bathroom and utility room.

February 2017: BWC awarded contract to install fire doors and steel wrap around frames from BestofSteel (whom BWC are a preferred installer) at Babraham Research Institute in Cambridge on behalf of Hutton Construction.

January 2017: BWC win their first contract with Lengard to fit out Spurriers House in Harlow. Works included a full internal strip out and re-build including new M&E, new floors, walls, ceilings, kitchens, bathrooms and upgrading of the roof.  

  • 1
  • 2